Started as 2 burners in parallel-Dual pressure plant; 3-9 barg; initial capacity was 700 tpd at 100%
-1982: Revamped with Uhde engineering
-2002: MDR increased at 980 tpd at 100%
-2003: Installation of a basket inside both burners to test N20 catalyst developed by owner
-2005: Increase N20 catalyst quantity in both burners
-2007-08: MDR increased to 100 td at 100% (steam turbine speed increased to 5920 rm)
-2012: Replacement of burner basket with new design
-2017: Replacement of burner basket with new design